top of page
Reverse Osmosis Water Plant

John Alfred Dock, Nassau

Client

Bethell Estates

Services Provided

The company were appointed for the turnkey design and
construction of the building to house the RO equipment and the
slab upon which the water storage tanks were to be placed

The Project included:
• Earthworks & Site preparation
• Construction of CMU/insutu concrete RO equipment building
• Personnel and coiling doors
• Interior and exterior finishes
• Construction of concrete slab for (2) 11,000 gallon water
storage tanks

Benefits to Customer

• Direct laison/co-ordination with Owner's RO Equipment Contractor and Electrical Contractor
• Fast track Construction

Project Background

Bethell Estates established a reverse osmosis water production facility to provide water for use on the John Alfred dock. The company appointed CCM to build housing for the RO water production facility. CCM fast-tracked the construction and was the direct liaison with the owner's RO equipment contractor and the electrical contractor.